Station M5, Chuk Lam Ming Tong                  
Date Start Time End Time  Weather Noise level (dB(A)), 30 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
05-Jun-12 13:01 13:31 Sunny 62 64 58 Rock out Road traffic noise and drilling in process in nearby building N.A 28.2 <5 B&K 2238   S/N : 2684502 B&K 4231  S/N: 2656516
11-Jun-12 13:31 14:01 Sunny 67 68 60 Rock out Road traffic noise and drilling in process in nearby building N.A 29.4 <5 B&K 2238   S/N : 2684502 B&K 4231  S/N: 2656516
21-Jun-12 10:12 10:42 Sunny 75 81 67 Muck out and holes drilling in tunnel Road traffic noise ,mainly from rock breaking near roadside from other contractor N.A 28.3 <5 B&K 2238   S/N : 2385180 B&K 4231  S/N: 2656516
27-Jun-12 10:07 10:37 Sunny 76 82 62 Muck out and holes drilling in tunnel Road traffic noise ,mainly from rock breaking adjacent roadside of NSR from other contractor N.A 27.4 <5 B&K 2238   S/N : 2385180 B&K 4231  S/N: 2656516
      Min. 62                
      Max. 76